Call us 0800 800 880

Scaffolding Tower 3.5m

In Stock

NOW ONLY

$799

Whether you’re painting, cleaning, building or tackling any other serious job at height, a quality scaffolding tower is essential for the enthusiastic home handyman.

Read more
14 people have this in their cart
Product overview

Product Overview

Whether you’re painting, cleaning, building or tackling any other serious job at height, a quality scaffolding tower is essential for the enthusiastic home handyman.

With a wide non-slip platform you’ll have plenty of room to move around safely. The tower is sturdy with tough cross braces for exceptional stability - exactly what you want when you’re high up off the ground! The lockable rubber castor wheels make it easy to roll it to your next spot. You can even work on uneven surfaces simply by adjusting the height of one side of the platform.

This scaffolding tower has been robotic welded then fully hot dip galvanised. This means the joints aren’t going to rust or become weak, even if you leave it out in the rain. The rivetless, weldless joints in the platform also give it extra strength, so not only is it super reliable, this scaffolding will make sure you get the job done safely as well.

A solid scaffolding tower is a great investment that will last for years - saving you the cost and trouble of hiring one again and again. Order yours today. You’ll wonder how you ever did without it.

Comes with a 2 Year Trade Tested warranty.

Recommended for DIY/domestic use. Refer to our Scaffolding Tower Safety Guide.

FEATURES
• Full galvanised steel construction
• Hot-dip galvanised finish
• Robotic welded
• Fully corrosion-resistant
• Non-slip tread on planks
• Ladders provide access from both sides
• Height adjustable for use on uneven surfaces (up to 250mm)
• Lockable, anti-wear non-slip rubber castors
• Load tested to AS/NZS 1576.3:1995
• 2 Year warranty

PARTS
- Ladder frame x 4
- Platform planks (1905mm x 240mm) x 3
- Adjustable base plate (up to 250mm) and lockable castor wheel x 4
- Diagonal brace bars x 4 sets
- All nuts, bolts and pins

SPECIFICATIONS
Assembled dimensions: 3.5m (H) x 1.9m (W) x 0.95m (D)
Maximum recommended working height: 3.5m
Material: Fully hot dipped galvalised steel
Frame diameter: 42.7mm
Frame steel thickness: 2.0mm
Castor diameter: 150mm
Total load rating: 350kg
Assembled weight: 125kg

Can we help?

Our friendly and knowledgeable gurus are trained to answer all your questions as quickly as possible. So if there’s anything you need to know just give us a call during business hours, or send us an email any time.

0800 800 880
Customer reviews

Customer reviews

Overall rating

4.2 out of 5 stars from 10 reviews
Jon Waikato

Solid Construction

about 1 month ago

2018-08-11 20:03:37

This galvanized steel scaffolding is very sturdy. It was a bit of a challenge assembling by myself, but would be easy with two people. It could have come with instructions, even though it is quite easy to figure it out. I have used aluminium scaffolding before that was a bit flimsy.

Rusty Canterbury

Great piece of kit

5 months ago

2018-05-03 21:33:17

I recently installed a new ceiling fan in our lounge, which has a cathedral style ceiling, a 5 metre peak. I purchased this scaffolding to allow me access the ceiling safely and this is exactly what this scaffolding allowed me to do. The erection process was executed by my myself with the assistance of my wife, to lift the top end sections into place. Weight wise, the sections can be be moved by a person with average lifting capacity. Having worked on building sites for many years and using scaffold on a number of occasions, I found no difficultly in putting the unit together, but my wife did say that for someone who had not done this before the job could be rather daunting. Suggestion of adding somesort of assembling instructions for those customers who have not done this prior would be of great benefit. Beside that minor issue, a great piece of kit for anyone who has height access issues. Falling from a ladder and causing yourself serious injury or even death is not worth the risk, especially when this kit is available at this cost.

Dazza Marlborough

Well designed equipment

5 months ago

2018-04-25 06:03:48

Owning schools that train people in scaffold erection and use, I have to say how impressed I am with the design and quality of this product. My only comment or suggestion would be that the manufacturer offers half height safety rails and perhaps kick boards for the top section. With these additions the set would be highly acceptable.

Michael Otago

Works a charm

7 months ago

2018-02-15 06:56:27

As a novice, they took a bit of figuring out, but they absolutely do the job I need them to do. Some of the welding is a bit average but it doesn't actually affect the way the scaff works.

Dave Wellington

Good solid platform

8 months ago

2018-01-28 20:23:53

It was easy to set-up and I'm using it now to pain my house no problems. Thanks Trade Tested for another great product.

Happy Northland

Scaffolding Tower 3.5m

9 months ago

2017-12-17 04:19:13

Generally good quality finish though some sections minor rough - no show-stoppers. Easy to erect with two able people. Good value for money work platform for the handyman.

Ross Northland

Scaffolding tower

12 months ago

2017-10-08 01:03:24

Good for diy easy to assemble needs a guard rail if working at 3.5 m made one up out of 90/50 timber tex screw on

Davo Bay+of+Plenty

Scaffolding

about 1 year ago

2017-09-21 06:05:16

Really great scaffold at 3.5 metres perfect height for doing maintenance on two story home, I got the outriggers which make the scaffold really stable, I have already saved the cost of the scaffold by not having to rent one! So we are very happy with this, just wish I had got it earlier! Awesome buy for the money, came very promptly and well wrapped, would recommend to everyone five star product

Ian howes Ohope beach

Scaffold tower

4 months ago

2018-05-19 20:38:42

The wheels do not all ways lock when set. Wheel direction not great making money big around a challenge at time Lugs securing cross member supports not large enough so supports often fall of. Delivery from Auckland to shaker and took 9 days from my payment. Already showing some rust threw damaged galvanizing on deliver Not value for money

RICK Hawkes Bay

RICK

11 months ago

2017-10-28 07:05:02

From a welders point of view the quality is crap and i would be ashamed if i welded these components. From a value for money point you could not make it and have it deliverd for the same money. It works well and is easy to put up. The frieght co TOLL here in Hastings is the best there is . Full marks to them. Trade teseted service is also fantastic.

Related categories