Call us 0800 800 880

Livestock & Utility Shelter 6m x 6m x 3.7m

In Stock be quick! Only 1 left

NOW ONLY

$4,099

Protect your livestock with this heavy-duty shelter.

Read more
6 people have this in their cart
Product overview

Product overview

Protect your livestock with this heavy-duty shelter.

Its tough galvanised steel frame and 610gsm U.V stabilised PVC cover make it the perfect shelter for livestock or pets when the weather turns rough.

The included gates keep all the animals where they should be and they are simple to remove when not required. Thanks to the straightforward design, this shelter is easy to put up and take down as you need it.

Backed by our 5 Year Warranty, it’s a great investment in the wellbeing of your valuable livestock or pets.

Perfect for horses, sheep, cows, pigs, goats, alpacas or any other animals you have running about, you can also use it as a temporary carport or storage area. Order yours today.

FEATURES
• Galvanised steel frame
• Removable gates
• 610gsm UV stabilised PVC cover
• Waterproof and fire resistant
• No interior wires or bracing for maximum space
• Easy to install and relocate
• 5 Year Trade Tested Warranty

SPECIFICATIONS
Dimensions: L 6m x W 6m x H 3.7m
Floor Area: 36m² (approx)
Frame construction: Ø60*1.5mm hot-dip galvanised steel tube, Ø38*1.5mm hot-dip galvanised steel tube
Roof material: 610gsm UV stabilised PVC
Packaged dimensions: 224cm x 122cm x 67cm
Weight: 361.8kg

Can we help?

Our friendly and knowledgeable gurus are trained to answer all your questions as quickly as possible. So if there’s anything you need to know just give us a call during business hours, or send us an email any time.

0800 800 880
Customer questions

Questions and answers

0 votes
q: The last shelter i had the goats chewed the cover. How then do i stop them from doing this? Is your pvc cover strong enough that they can't?
a: It's very tough PVC, however it's hard to be certain that it would be completely impervious to determined goats! We would suggest there are no loose corners etc for them to latch onto would be a good start.
By Trade Tested on June 26, 2019
0 votes
q: Can these be erected over a container?
a: You probably could with some lateral thinking, however we would recommend one of our traditional style container shelters for this.
By Trade Tested on February 7, 2019
-1 votes
q: Hi, Are these shelters suitable in a high wind zone?
a: They're very sturdy, however they are not designed specifically for what an engineer would classify a high wind zone. Perhaps check out the reviews for this and our container shelters to get an idea of their durability and where people are using them.
By Trade Tested on March 20, 2019
-1 votes
q: Is it designed to be free standing or has it got anchoring points?
a: It has foot plates, so how you secure it is up to you and your particular application, for example you could bolt it to a concrete slab. Check out our customer review photos for a better look at the foot plates.
By Trade Tested on April 22, 2019
Customer reviews

Customer reviews

Overall rating

4.8 out of 5 stars from 4 reviews
LJ Rotorua

shelter

about 1 month ago

2019-08-03T20:02:33+00:00

Put this shelter up to be used to cover to work truck, was easy to build in 6 hrs with 5 men on concrete base

Brent Wellington

From Animal Structure To Carport.

9 months ago

2018-12-13T17:07:56+00:00

My son has grown out of his single bed cupboard of a bedroom. So we're converting the internal garage into his new bedroom. However we need to remove all the junk from the garage before he can move in. We looked at building a new external garage or substantial permanent carport. But found that I needed to sink pilings, obtain an engineering report and get building consent. All way too expensive! So we started looking for temporary strictures to get around the building consent process and discovered the stock shelter. It is big! Very big! I didn't appreciate how big until it was erected. The height, at just under 4 meters, is the most surprising aspect. It arrived in a large palitised cardboard box, well wrapped and undamaged. Five of us (3 adults, 2 children) erected it in a day and a half. We started by constructing the 4 main hoops then stood them upright and bolted the side longitudinal braces to make it a free standing structure. Not having high enough ladders we unbolted and removed one side wall so that we could lower the top of the structure down to add the final top longitudinal braces. Then we lifted it back up and reattached the sidewall. There are a lot of nuts and bolts that need to be tightened. I used an electric drill with a socket, which was invaluable. Some of the instructions on where to put which bolts were incorrect. I found, the main tarpaulin a nightmare to put on. We tied ropes to the two end tie downs and tried to pull it over the structure from one side to the other. Not a good idea too much weight and too much friction to easily pull it over. But we got there eventually. Perhaps if I had laid the tarpaulin over the frame when I had the side wall off it would have been easier. But I was concerned that I would not have been able to lift the combination weight to refit the side wall. Tensioning it is a concern, it is tight over the hoops but not on the rest of the frame. The end wall was easy , I started by securing it half way up then securing a bit on each side until I reached the top. Then secured the bottom half. A video demonstrating how best to construct the frame and put the tarpaulin on, also how to correctly tension would be my recommendation. The kit comes with 4 ground screws which, in our sandy ground, was easy to install. We have placed one side of the structure on top of a retaining wall and bolted it to that so we have all 4 ground screws holding the other side wall to the ground. Just as well to as a few days after its erection we had 120 km hour winds. The shelter came through fine but two things stood out. It's noisy in the wind! The metal bolted parts move against each other, creating quite a racket in the wind. Something to be considered if you're building it right next door to a bedroom like we have. Perhaps small bits of felt could be supplied to put between each metal joint to alleviate the problem. The other thing is that we chose not to erect the front gates so that left it a slightly structurally weakened. I purchased some ratchet tie downs and secured them in a diagonal fashion across the top of the front which has stiffened the entire structure and fix that problem. Overall very happy with the shelter and highly recommend it. Here is a link to some pictures. https://photos.app.goo.gl/bzzTcmLvNdQFJNM98 Cheers Brent

KcAS Canterbury

Cooler than you would think

about 1 year ago

2017-12-18T15:32:06+00:00

The instructions for installing the metal frame are adequate, there is some interpretation required. The instructions for installing the rear and cover are minimal at best. There is a lot of trial and error involved. The ground anchors are a nice idea, however posts do a better job in our soil. It is amazingly cool within the shelter once it is erected. It took 3 people a full-day to install this shed.

Parks Auckland

Work shelter

about 1 year ago

2017-11-29T07:19:00+00:00

Genially happy with product. Could possible improve the durability of the end cover connecting ties

Related categories